The execution of works on the motorway E-763 section from New Belgrade to Surčin, in a length of 7.9 km, is intensive.
The state road, section New Belgrade – Surčin, is located on the left bank of the river Sava. It has been designed for the calculated speed of 80 km/h, and, once completed, will represent the shortest link between the city of Belgrade and the motorway Е-763 (“Miloš Veliki“),
The road will have a bidirectional carriageway, with three traffic lanes for each direction, pedestrian paths, and bidirectional cycling lanes in one segment. There will be also four bridges and two overpasses on the roadway.
You may watch the latest footage of the section construction, on the following link: 13.10.22. Works on the construction of the New Belgrade - Surčin road
Stay up to date with the construction of large infrastructure projects at the “Roads of Serbia”’s Youtube channel.
Watch and be informed!