The PE Roads of Serbia is informing the public that due to the construction works on:
- construction of new interchange Bubanj Potok on the Belgrade Bypass and its matching with the existing motorway, on I A Category state road No. 1 in both directions, traffic regime is modified from the exit from the motorway to the Roundabout to the interchange Tranšped
- several segments of I A Category state road No. 1, from Aleksinac to Paraćin, in the direction of Belgrade, traffic regime modification is in effect.
The PE Roads of Serbia is appealing to all traffic participants to adapt their speed to the road conditions, obey displayed temporary traffic signage, and to be patient since the increased traffic intensity may be expected over the next few days.
Detailed, real time information on conditions on the state roads of the Republic of Serbia is available on the web presentation of the PE Roads of Serbia at the following link: https://www.putevi-srbije.rs/index.php/sr/servisne-informacije-all
You may also follow us on social networks Twitter, Instagram and Facebook!