There are intensive works on the segment of motorway Е-763 from Novi Beograd to Surčin in the length of 7.9 km.
State road, section Novi Beograd - Surčin, is located on the left side of river Sava, and it is designed for calculation speed of 80 km/h. Upon its completion, it will be the shortest link between the City of Belgrade and the motorway E-763 (“Miloš Veliki”).
The road will consist of two carriageways, each containing three traffic lanes, as well as footpaths, and two-way bike paths on a certain segment.
The newest videos are available at the following link: 28.12.21. Belgrade Bypass, Sectors 5 and 6
Follow the newest content, on a weekly basis, on the YоuTube channel of the PE “Roads of Serbia”.
Watch and stay informed!