Today, the first tube of the tunnel “Beli Potok” was bored at Sector 6 of the Belgrade bypass. The works on the tunnel were performed using the so-called “open-cut excavation”. The tunnel “Beli Potok”, 360m long, is the most demanding structure at Sector 6 of the Belgrade bypass, from Straževica to the interchange Bubanj Potok.
The tunnel boring was, besides the Minister of Construction, Transport and Infrastructure, Goran Vesić, attended by the State Secretary Mihajlo Mišić, the Deputy Minister for Road Transport, Miroslav Alempić, the Director of the PE “Roads of Serbia” Zoran Drobnjak, the representatives of the Contractor and the project associates.